Portfolio
Projects
Every savings initiative from idea to tracked actuals. Filters, search and views are live in this preview.
All 82D Concept 13C Advanced 11B Approved 9A Planning complete 8I Implemented 34R Rejected 7
LeverSourcingEngineeringManufacturingLogisticsSG&AQualitySite Mexicali P1 Mexicali P2 Tijuana DC Brea HQ Querétaro Pending approval
Showing
13 projects
12-month net
$1.6M
Risk-adjusted
$412K
Actual to date
$0
| Project | Stage | Type | Site | Owner | Impl. date | Health | Confidence | 12-mo net | Actual to date | |
|---|---|---|---|---|---|---|---|---|---|---|
| Volume rebate 2027 — Meridian AlloysPT-0230 · Implants · Meridian Alloys (demo) | DConcept | PPV | Mexicali P2 | KT Kevin Tran | Jul 2027 | On track | 25 | $273,960 | — | |
| Volume rebate 2027 — Zenith Steri-PackPT-0240 · Orthodontics · Zenith Steri-Pack (demo) | DConcept | PPV | Mexicali P2 | AS Ana Sofía Lara | Jan 2027 | On track | 25 | $245,748 | — | → C |
| Overtime reduction in Mexicali P1 final packPT-0227 · Consumables | DConcept | Cost center | Mexicali P1 | GK Grace Kim | Apr 2027 | On track | 25 | $222,240 | — | |
| Zenith Steri-Pack annual price negotiation 2027PT-0232 · Corporate · Zenith Steri-Pack (demo) | DConcept | PPV | Mexicali P2 | GK Grace Kim | Mar 2027 | On track | 25 | $209,705 | — | |
| Resource scanner tip to Orion ElectronicsPT-0236 · Consumables · Orion Electronics (demo) | DConcept | PPV | Querétaro | HS Hugo Salinas | May 2027 | On track | 25 | $133,800 | — | |
| Impression-material tubes: switch to recycled HDPEPT-0114 · Consumables · Greenpak Plastics (demo) | DConcept | PPV | Mexicali P2 | FO Fernanda Ochoa | Mar 2027 | On track | 25 | $132,000 | — | → C |
| Resource impression tray to Bluewater Medical PlasticsPT-0228 · Consumables · Bluewater Medical Plastics (demo) | DConcept | PPV | Mexicali P1 | PN Priya Nair | Jun 2027 | On track | 25 | $110,568 | — | → C |
| Complaint-driven returns reduction: implant driverPT-0233 · Orthodontics | DConcept | Sales | Mexicali P2 | NI Natalia Ibarra | Dec 2026 | On track | 25 | $101,604 | — | → C |
| Resource ceramic bracket to Pinnacle PackagingPT-0246 · Implants · Pinnacle Packaging (demo) | DConcept | PPV | Mexicali P1 | NI Natalia Ibarra | Feb 2027 | On track | 25 | $76,317 | — | → C |
| Returnable dunnage for shipping cartonPT-0243 · Consumables · Zenith Steri-Pack (demo) | DConcept | Logistics | Brea HQ | FO Fernanda Ochoa | Feb 2027 | On track | 25 | $51,396 | — | → C |
| Common ceramic bracket across product familyPT-0234 · Corporate · Summit Molding (demo) | DConcept | Design change | Mexicali P1 | FO Fernanda Ochoa | Aug 2027 | On track | 25 | $33,192 | — | |
| Orion Electronics annual price negotiation 2027PT-0249 · Corporate · Orion Electronics (demo) | DConcept | PPV | Mexicali P1 | HS Hugo Salinas | Feb 2027 | On track | 25 | $31,692 | — | → C |
| Common scanner tip across product familyPT-0238 · Corporate · Cedar Components (demo) | DConcept | Design change | Brea HQ | NI Natalia Ibarra | Oct 2027 | At risk | 25 | $27,684 | — |